Annual Slurry Seal Project (FY25/26)

City Project No. PW-720-25

Slurry Seal Application Scheduled for August 3–5, 2026

Slurry seal application is scheduled to take place on designated streets in the Lunada Bay area from Monday, August 3 through Wednesday, August 5, 2026.

During application, affected streets will be fully closed to pedestrian and vehicle traffic from 7:00 A.M. to 4:00 P.M., or until the pavement is completely dry.

Please observe all posted “No Parking” signs and traffic-control directions. Work is currently scheduled only for August 3–5.

Project Overview

The City of Palos Verdes Estates awarded a construction contract to Pavement Coatings Co. for the FY25/26 Annual Slurry Seal Project within the Lunada Bay area.

Preparatory work is scheduled to begin on July 13, 2026. Application of the slurry seal treatment is scheduled to begin on August 3, 2026, and the Project is anticipated to be completed by August 28, 2026.

Working hours are 7:00 A.M. to 4:00 P.M., Monday through Friday. The schedule may change due to weather, construction conditions, or other unforeseen circumstances.

Key Project Dates

July 13, 2026 Preparatory construction work begins.
August 3–5, 2026 Slurry seal application on designated streets.
August 28, 2026 Anticipated overall Project completion.

Project Map and Documents

Review the documents below to determine whether your street is included and the scheduled date of slurry seal application.

Street-by-Street Schedule

View the complete list of streets and scheduled application dates.

View Schedule List

Application Schedule Map

View the color-coded map showing the scheduled application date for each Project street.

View Project Map

Construction Notice

Download the complete resident construction notice for the FY25/26 Annual Slurry Seal Project.

Download Notice

Sample Door-Hanger Notice

View the notice that will be distributed to affected homes before work occurs.

View Door Hanger

Slurry Seal Application Schedule

The scheduled streets are listed below. Please refer to posted “No Parking” signs and the door-hanger notice delivered to your home for the exact closure date and time applicable to your property.

Date Street From To
Monday
August 3
Plaza Francisco Via Asturias Via Castilla
Via Asturias Via Castilla Via Castilla
Via Castilla Via Barcelona Cul-de-sac
Via Valdes Via Olivera Via Zumaya
Via Romero Via Carrillo Via Zumaya
Via Descanso Via Estudillo Cul-de-sac
Via Estudillo Dolores Plaza Via Olivera
Dolores Plaza Via Coronel Via Coronel
Via Landeta Via Garfias Via Zurita
Via Landeta Via Zurita Via Coronel
Via Martinez Via Lopez Via Zurita
Tuesday
August 4
Via Castilla Via Barcelona Via Zumaya
Via Davalos Via Coronel Cul-de-sac
Zorillos Place Via Coronel Cul-de-sac
Plaza Blanca Via Coronel Via Coronel
Muros Place Via Coronel Cul-de-sac
Via Leon Via Coronel Cul-de-sac
Noya Place Via Coronel Cul-de-sac
Via Margate Palos Verdes Drive West Via Boronada
Via Boronada Via Margate Palos Verdes Drive West
Via Curva Via Coronel Via Coronel
Via Zurita Via Fernandez Via Coronel
Wednesday
August 5
Via Boronada Via Margate Via Coronel
Via Estudillo Espinosa Circle Rico Place
Rico Place Via Estudillo Cul-de-sac
Via Sanchez Via Olivera Via Olivera
Plaza Andres Via Castilla Via Andres
Via Andres Via Castilla Cul-de-sac
Via Galicia Via Castilla Cul-de-sac
Via Castilla Via Coronel Via Zumaya
Via Lopez Via Fernandez Via Zurita

View Printable Schedule

Scope of Work

The Project includes:

  • Slurry seal application, curing, and monitoring.
  • Crack sealing to fill pavement cracks before slurry seal placement.
  • Localized asphalt patching.
  • Removal and replacement of pavement striping and markings.

What Is Slurry Seal?

Slurry seal is a mixture of liquid asphalt and sand that is applied to streets to protect the asphalt and underlying roadway from water damage and ultraviolet rays. It also helps increase skid resistance and extends the life of the existing pavement.

When slurry seal is first applied, it may appear light brown. As the material is exposed to heat and sunlight, it will gradually turn black. The finished surface will have a rougher appearance than a newly overlaid street.

Residents may notice some shedding of small rocks for approximately four to six weeks after application. This is normal and the loose material will be collected during future street-sweeping operations. The slurry seal may take several months to fully cure.

Vehicle movement on recently treated streets may also create temporary tire marks, commonly called power-steering marks. Although these marks may initially affect the appearance of the street, they will fade over time.

Street Closures and No Parking

During slurry seal application, vehicle and pedestrian access within the work area will be temporarily restricted until the new surface has adequately cured.

Because many streets in the City do not have sidewalks, residents who walk, jog, walk dogs, ride bicycles, use strollers, or participate in other outdoor activities may encounter temporary closures and detours.

Most affected streets will be fully closed to through vehicle and pedestrian traffic during application.

Entering a street where slurry seal has recently been applied can damage the new pavement and may cause slurry material to stick to shoes, pet paws, bicycle tires, strollers, and other equipment.

“No Parking” signs showing the exact closure date will be posted near the work area at least 48 hours in advance. A door-hanger notice will also be distributed to affected homes. In most cases, streets will reopen by 4:00 P.M. or after the pavement is fully dry.

How Residents Can Help

Please help ensure the slurry seal can cure properly by following these instructions:

  • Avoid the active work area and follow all posted signs and traffic-control directions.
  • Use alternate routes until the roadway has reopened to the public.
  • Remove vehicles from the street by the time shown on the posted “No Parking” signs.
  • Carefully verify the date shown on the signs, as adjacent streets may be scheduled on different days.
  • Do not drive, walk, bicycle, or travel across wet slurry seal.
  • Do not operate sprinkler systems on the day of application or for 24 hours afterward.
  • Prevent irrigation water or other runoff from entering the street, as water can damage the slurry seal material.
Please plan ahead. Residents who need to use their vehicles during closure hours should move them to an adjacent, unaffected street before the posted closure begins.

Trash Pickup and Street Sweeping

The contractor will coordinate with Athens Services to allow for normal trash pickup operations or to arrange for trash pickup before the affected street is closed.

Street sweeping will be temporarily suspended in affected areas to allow the slurry seal to properly cure. Vehicles will not be cited on scheduled street-sweeping days in areas affected by the slurry seal Project.

Contact Information

The City appreciates the community’s patience and cooperation while these important pavement-preservation improvements are completed.

If you have questions, please contact:

Pavement Coatings Co.
Marc Mumford – Superintendent
Phone: (714) 713-7980

City of Palos Verdes Estates
Chuck Wilson – Public Works Inspector
Phone: (909) 530-8245